This study aims to make a miniature Pico Hydro-Hydro Power Plant (PH-HPP) system with load variations.  The research method used in this research consists of the stages (1) identification of the problem, (2) design, (3) development and (4) application.  Based on the results of observations at the development stage, the number of revolutions using one nozzle was greater than 29%, namely 1080 rpm for one nozzle and 758 rpm for 2 nozzles.  The measured output voltage when using a 3 watt load is 142 VAC and the measured voltage when using a 100 watt load is 106 VAC.  The measured output voltage on the control panel is inversely proportional to the load given, and this is because the higher the wattage load on the lamp, the heavier the generator rotates so that the output voltage on the generator is getting smaller.

Keywords


Miniature, Electrical Energy, PLTA PH

Full Text:

PDF

References


PT PLN, ‘Laporan Tahunan PLN 2019’, Jakarta, 2019.

A. Susanto, ‘ANALISIS POTENSI SUMBER DAYA AIR UNTUK PEMBANGKIT LISTRIK TENAGA MIKROHIDRO DI BENDUNG LODOYO BLITAR Disusun’, Universitas Muhammadiyah Surakarta, 2019.

Badan Pusat Statistik, ‘Kapasitas Terpasang (MW) Perusahaan Listrik Negara (PLN) menurut Jenis Pembangkit Listrik, 1995-2018’, Jakarta, 2019.

Sukandarrumidi, H. Z. Kolta, and D. Wintolo, Energi Terbarukan, Konsep Dasar Menuju Kemandirian Energi. Yogyakarta: Gadjahmada University Press, 2015.

Badan Pusat Statistik, ‘Rata-rata Harian Aliran Sungai, Tinggi Aliran, dan Volume Air di Beberapa Sungai yang Daerah Pengalirannya Lebih dari 100 km2’, Jakarta, 2015.

R. Indonesia, Undang-undang Republik Indonesia No 12 Tahun 2012 Tentang Pendidikan Tinggi. Indonesia: Sekretariat Negara, 2012.

Irvawansyah, A. Imran, and H. A. W. Rauf, ‘Studi Estimasi Kebutuhan Energi Listrik Di Kabupaten Sidrap Sampai Tahun 2020’, Universitas Negeri Makassar, 2010.

A. Purnama, ‘PEMBANGKIT LISTRIK TENAGA MIKROHIDRO Studi Kasus : PLTMH Minggir pada saluran irigasi Minggir di Padukuhan Klagaran Desa Sendangrejo Kecamatan Minggir Kabupaten Sleman’, UNSA Prog., vol. 10, no. 15, pp. 93–111, 2011.

H. Pratama and I. Prastyaningrum, ‘PENGARUH MODEL PEMBELAJARAN PROJECT BASED LEARNING BERBANTUAN MEDIA PEMBELAJARAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO TERHADAP KEMAMPUAN BERPIKIR KRITIS’, J. Penelit. Fis. dan Apl., 2016, doi: 10.26740/jpfa.v6n2.p44-50.

A. Zuhud, Sukamji, D. Aries, and Danardono, ‘Redesign runner turbin pembangkit listrik tenaga pico hydro dengan metode reverse engineering melalui pendekatan teoritis’, J. Tek. Mesin Indones., 2018, doi: 10.36289/jtmi.v11i2.54.

H. P. Dewanto, D. A. Himawanto, and S. I. Cahyono, ‘Pembuatan dan pengujian turbin propeller dalam pengembangan teknologi pembangkit listrik tenaga air piko hidro (PLTA-PH) dengan variasi debit aliran’, J. Tek. Mesin Indones., 2018, doi: 10.36289/jtmi.v12i2.72.

A. Havendri, D. A. Saputra, and M. C. Nurmansyah, ‘Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat’, Met. J. Sist. Mek. dan Termal, 2017, doi: 10.25077/metal.1.1.20-26.2017.

L. Susanto, T. Priangkoso, and D. Darmanto, ‘PERANCANGAN TURBIN PELTON SKALA PIKO HIDRO KAPASITAS 1 KW’, J. Ilm. MOMENTUM, 2019, doi: 10.36499/jim.v15i2.3076.

P. D. Sugiyono, metode penelitian kuantitatif, kualitatif,dan R&D. 2016.




DOI: http://dx.doi.org/10.33857%2Fpatj.v4i2.379

Refbacks

  • »
  • »
  • »
  • »
  • »


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

View My Stats

Editorial Office Department of Electrical Engineering :

Jl. Tun Abdul Razak, Paccinongang, Kec. Somba Opu, Kabupaten Gowa, Sulawesi Selatan 90235 | Email : pa.techjournal@gmail.com