Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Atap Off Grid Di Mesjid Al-Anshar, Kelurahan Maliaro Ternate

Authors

  • Muhammad yunus Hi Abbas Program Studi Teknik Elektro, Fakultas Teknik Universitas Khairun
  • Ramly Rasyid Program Studi Teknik Elektro, Fakultas Teknik Universitas Khairun
  • Hafid Syaifuddin Program Studi Teknik Elektro, Fakultas Teknik Universitas Khairun

DOI:

https://doi.org/10.33857/patj.v9i2.1020

Keywords:

PV, Helioscope

Abstract

This solar power plant system illustrates a process of maximizing renewable energy utilization. Frequent power outages due to system disruptions cause damage to many electronic devices, so a system was designed to support electricity availability within the mosque. This research method utilizes qualitative research, systematically recording observations and interviews. The qualitative research process begins with establishing basic assumptions and the rules of thought that will be applied in the study. This study will utilize Helioscope software simulations, which simulate system operation to determine the arrangement and number of solar panels, batteries, and inverters used under specified conditions, as well as the system's operation. The results of the PLTS system simulation designed using Helioscope software include 4 units of Longi PLTS Modules, LRS-72HPH-550M (220) with a capacity of 550 W, 4 units with a total installed capacity of 2.20 kW, as well as 1 unit of SPF 5000 ES (5 kW) inverter and 3 units of Lithium iron Phosphate batteries (48 V, 100 Ah).  

References

K. Piotrowska, I. Piasecka, Z. KÅ‚os, A. Marczuk, and R. Kasner, “Assessment of the Life Cycle of a Wind and Photovoltaic Power Plant in the Context of Sustainable Development of Energy Systems,” Materials (Basel)., vol. 15, no. 21, 2022, doi: 10.3390/ma15217778.

A. Alzahrani, “Short-Term Solar Irradiance Prediction Based on Adaptive Extreme Learning Machine and Weather Data,” Sensors (Basel)., vol. 22, no. 21, 2022, doi: 10.3390/s22218218.

M. V Marathe, "Sustainable energy systems and analysis". 2010.

Kementerian ESDM, “Peraturan Menteri Energi Dan Sumber Daya Mineral No 26 Tahun 2021 Tentang Pembangkit Listrik Tenaga Surya Atap Yang terhubung Pada Jaringan Tenaga Listrik Pemegang Izin Usaha Penyediaan Tenaga Listrik Untuk Kepentingan Umum,” Ber. Negara RI tahun 2021 Nomor 948, no. 1, pp. 1—35, 2021.

P. Yadav, N. Kumar, and S. S. Chandel, “Simulation and performance analysis of a 1kWp photovoltaic system using PVsyst,” 4th IEEE Spons. Int. Conf. Comput. Power, Energy, Inf. Commun. ICCPEIC 2015,pp.358—363, 2015, doi: 1109/ICCPEIC.2015.7259481.

Y. Nainggolan, N. W. Febriana Utami dan I. G. Alit Gunadi, “Studi Potensi Wisata Pantai Pemuda Jimbaran,,” Arsitektur Lansekap, p. 2, 2020.

Naim, Muhammad. "Rancangan Sistem Kelistrikan Plts Off Grid 1000 Watt Di Desa Loeha Kecamatan Towuti." Vertex Elektro 12.1 (2020)

Amalia, Dita, Hamid Abdillah, and Tri Winahyu Hariyadi. "Analisa Perbandingan Daya Keluaran Panel Surya Tipe Monokristalin 50wp Yang Dirangakai Seri Dan Paralel Pada Instalasi PLTS Off-Grid." Jurnal Elektro dan Mesin Terapan 8.1 (2022)

Al Hakim, Rosyid Ridlo, et al. "Implementasi PLTS Di Desa Pulisan, Sulawesi Utara.

Published

2026-02-13